News Updates
June 2008: EV-5B secondary methanol recovery for batches of 300 gallons of biodiesel built and delivered. Liquid / Solid Ejecting Centrifuge prototype parts are being built. PC-10 prototype parts are being built.
May 2008: DM-15 system built and delivered (May 2008)
January 2008: Article about Pacific Centrifuge - .pdf
September 2007: DM-5 and DM-10 methanol recovery systems integrated with PC-5 automatic operation are shipped and installations are starting
April 2007: New inline continuous methanol recovery for 5 and 10 gpm production is launched
February 5th & 6th, 2007:
Pacific Centrifuge to attend the Biodiesel Conference and Expo in San Antonio, TX.
February 1st, 2007: Move to a much larger and capable facility for production and testing is completed.
April 18th, 2006: Demethylator designs are started for 5 gpm flow rate methanol distillation from biodiesel and glycerol. Ballpark pricing and layout is forthcoming.
March 18st, 2006: Representatives
from Pacific Centrifuge, LLC attend and showcase products at the
Northwest Biodiesel Forum in Seattle, Washington. |